How it works

From survey to service.

Every deployment starts on your floor. We survey it, set ARTIC up for your products and your network, and nothing runs until you have approved the cleaning map.

A person in safety glasses and a high-visibility vest watches ARTIC at floor level.

Step by step

Five steps to a cleaner floor.

  1. Site survey

    We map the warehouse, racking and shelving, and measure clearances, floors and gradients. Ramps, dock plates and floor steps are mapped as excluded zones. You approve the cleaning map.

  2. Security review

    Your IT team gets our security pack: the port and flow list, software bill of materials and vulnerability scan results. You are welcome to run your own penetration test.

  3. Product recognition

    Using samples and photographs of your packaging, we teach ARTIC to recognise the products most likely to end up under your storage. It takes about four weeks.

  4. Installation and go-live

    We commission the on-site server, robots and docks, agree the zones and time windows with your health and safety team, and train your staff.

  5. Closed-Site Service

    Monthly reports produced on site, a mid-year health check with consumables sent ahead of need, and one signed software release a year.

Day to day · nominal figures

A shift on one charge.

ARTIC V2 cleans for up to six hours, returns to its dock at a set charge threshold or the end of its route, charges in about two hours, then resumes from where it stopped.

Timeline: about six hours of cleaning, followed by about two hours of charging on the dock, then cleaning resumes.

Closed-Site Service

The service year.

Everything runs and stays on your site. Support is by phone and email, and data leaves only when your team chooses to send it.

Month 0

Install

Server and robots commissioned, site mapped, zones approved and staff trained.

Monthly

Local report

A coverage, runtime and fault report produced on site and reviewed with you by phone.

Month 6

Health check

A mid-year review of the diagnostic bundle you release. Consumables sent ahead of need.

Month 12

Annual release

A signed update installed through Mission Control. Brushes, filters and seals renewed and sensors recalibrated.

Your part

What we need from you.

It works best when operations, health and safety and IT are involved from the start.

  • A site contact and access for the survey
  • The product families most likely to end up under your storage, with sample items
  • Photographs or samples of typical packaging
  • Agreement on how a recovered item is returned to stock
  • Your health and safety team, to agree zones, time windows and the safety case
  • Your IT team, to choose between a VLAN on your network and a fully isolated one

Get started

Start with a survey of your floor.

We map your warehouse, racking and shelving, measure clearances, floors and gradients, and you approve the cleaning map before anything runs.

Book a site survey