Install
Server and robots commissioned, site mapped, zones approved and staff trained.
How it works
Every deployment starts on your floor. We survey it, set ARTIC up for your products and your network, and nothing runs until you have approved the cleaning map.

Step by step
We map the warehouse, racking and shelving, and measure clearances, floors and gradients. Ramps, dock plates and floor steps are mapped as excluded zones. You approve the cleaning map.
Your IT team gets our security pack: the port and flow list, software bill of materials and vulnerability scan results. You are welcome to run your own penetration test.
Using samples and photographs of your packaging, we teach ARTIC to recognise the products most likely to end up under your storage. It takes about four weeks.
We commission the on-site server, robots and docks, agree the zones and time windows with your health and safety team, and train your staff.
Monthly reports produced on site, a mid-year health check with consumables sent ahead of need, and one signed software release a year.
Day to day · nominal figures
ARTIC V2 cleans for up to six hours, returns to its dock at a set charge threshold or the end of its route, charges in about two hours, then resumes from where it stopped.
Timeline: about six hours of cleaning, followed by about two hours of charging on the dock, then cleaning resumes.
Closed-Site Service
Everything runs and stays on your site. Support is by phone and email, and data leaves only when your team chooses to send it.
Server and robots commissioned, site mapped, zones approved and staff trained.
A coverage, runtime and fault report produced on site and reviewed with you by phone.
A mid-year review of the diagnostic bundle you release. Consumables sent ahead of need.
A signed update installed through Mission Control. Brushes, filters and seals renewed and sensors recalibrated.
Your part
It works best when operations, health and safety and IT are involved from the start.
Get started
We map your warehouse, racking and shelving, measure clearances, floors and gradients, and you approve the cleaning map before anything runs.